THE MARCH 16TH OAK SPRING ROAD BRIDGE OPEN HOUSE HAS BEEN CANCELED. NEW DATE TO BE DETERMINED.                                                   

 OAK SPRING ROAD BRIDGE IMPROVEMENTS STUDY                                              

The Libertyville Township Highway Department cordially invites the public to attend a Public Information Meeting regarding proposed improvements to the Oak Spring Road Bridge. The purpose of the meeting is to seek public input and comments on the proposed preliminary design plans.  The meeting will be held in an open house format at the Libertyville Township Offices, 359 Merrill Court, Libertyville, IL 60048 from 5:00 to 7:00 p.m. on March 16, 2020.  Exhibits will be on display for viewing and representatives from the Highway Department and their consultant staff will be available for discussion and to answer questions.  Written comments may be completed at the meeting or mailed in until April 1, 2020. Inquiries may be directed to Mr. Martin Neal Highway Commissioner, Libertyville Township Highway Department (847) 362-3350. This meeting will be accessible to persons with a disability in compliance with current Accessibility Standards prepared by the Capital Development Board. Persons with a disability planning to attend and needing special accommodations should contact the person listed in this Notice by March 9, 2020.                                                                                                                     

OAK SPRING ROAD BRIDGE MEETING INVITE (pdf)     

OAK SPRING ROAD EXHIBITS AND COMMENT FORM (pdf)

                          

 ROCKLAND ROAD CONSTRUCTION UPDATE:

The winter shutdown for the E. Rockland Rd. construction project will end and construction will resume as of February 3, 2020. Lanes will be reduced to one-lane eastbound only.  

Construction on Rockland Road between Milwaukee Ave. (IL Route 21) to St. Mary’s Road will resume as of February 3, 2020. The project does not include the section at the bridge over the Des Plaines River.  

The segment of Rockland Road between Milwaukee Avenue to the bridge is under the Village’s jurisdiction.  The segment between the bridge and St. Mary’s Road is under the jurisdiction of the Libertyville Township Highway Department.  The roadway reconstruction work is being completed in separate construction contracts, one for each segment. 

The Village’s segment (Milwaukee Avenue to the bridge) includes new storm sewers, water main replacements, sanitary sewer relocations and private utility work. 

It is anticipated that the roadway pavement reconstruction work for both segments will be completed in 2020. In order to complete the pavement reconstruction traffic will be shifted to one-way eastbound. Westbound traffic will be detoured via IL Route 176.  Replacement of the bridge carrying Rockland Road over the Des Plaines River will be part of a future project. It is anticipated that the replacement of the bridge will occur no sooner than 2022.

 

 LIBERTYVILLE TOWNSHIP / VILLAGE OF LIBERTYVILLE ROCKLAND ROAD RECONSTRUCTION PROJECT CONSTRUCTION INFORMATIONAL OPEN HOUSE (PDF)

Rockland Road - Milwaukee Avenue (IL Route 21) to Des Plaines River (pdf)

 

 

FIVE YEAR ROAD PROGRAM 2020-2024(PDF)

 

 

OAK SPRING ROAD BRIDGE PHASE 1 STUDY:

 

 

ROCKLAND ROAD PHASE 1 STUDY

November 16, 2016 Neighborhood Meeting

 

 

March 2, 2017 Public Information Meeting

The purpose of this meeting was to present the study process, present existing conditions, present the proposed improvement, present the project schedule, and gather input on the proposed improvement within the Village and Township jurisdictions (IL Route 21 to St. Mary's Road).

Meeting Summary/FAQ Sheet(pdf)

 

 PHOTOGRAPH OF FLAGGED STAKES DISPLAYING EXISTING AND PROPOSED DIMENSIONS(PDF)

 It has come to our attention that individuals along Rockland Road have chosen to place their own markings along the roadside, in ditches, and on trees, beyond the roadside stakes placed by Township Highway Department staff and Professional Engineers.  Any markings placed by those other than Township Highway Department representatives are not based on technical engineering analyses.  Therefore, the reliability and accuracy of any of the markings you may see along Rockland Road can no longer be guaranteed.

 

ROCKLAND ROAD PHASE 1 STUDY - SPECIAL MEETING TUESDAY, MAY 23, 2017

ROCKLAND ROAD PHASE 2 and PHASE 3

ROCKLAND ROAD (DES PLAINES RIVER TO ST. MARY'S ROAD)  REQUEST FOR STATEMENTS OF INTEREST/QUALIFICATIONS/PROPOSALS - PHASE 11 ENGINEERING(PDF)

Rockland Road RFQ Addendum

DESIGNATED TRUCK ROUTE SYSTEM/WEIGHT CONTROL

 

 

PERMIT FORMS:

Permits can be submitted either by email to: This email address is being protected from spambots. You need JavaScript enabled to view it.                                                                                                                                                  fax 847.816.0861, or mail to 343 Merrill Court, Libertyville IL 60048.

 

 

 

 

Contact Information

Office of the Highway Commissioner

343 Merrill Court
Libertyville, IL 60048
Phone: 847-362-3350
Fax: 847-816-0861

Highway Commissioner
This email address is being protected from spambots. You need JavaScript enabled to view it.
847-362-3350